How does every
great project begin?

Framing_Head

By reframing the mind.

The Omega Construction Process
Different results require a radically different point of view. By asking what success looks like long before a project has started, you’ll find a better answer. Improve Group’s four-phase Omega Construction Process begins by drafting the most complete picture of success for your building project and aligning key players around the objective and your organization’s culture and identity. Then, using immersive design technology and innovative construction methods, we build the space you need while building in more cost certainty, more opportunity, and a more prosperous future.
Begin with the end in mind.

The best buildings are built with the end in mind. What is its long-term objective, long after the paint has dried and the last nail has been hammered? Before a project is designed, we align all stakeholders around the long-term organizational and operational objectives using an integrated discovery process. Most contractors, vendors, and industry partners skip (or downplay) this step, and inevitably discover their lack of alignment during design, construction, or worse — operations. Building a forward-looking, integrated plan creates efficiencies in every other phase and ultimately maximizes the value of your space.

Design with complete clarity.
Construct with flexibility.
Measure transformability.

How ready are you?

The Work of Omega

omega-master-planning

Master Planning

Our comprehensive approach gathers key decision-makers together to map out clear objectives and align space needs around those defined goals.

omega-immersive-design

Immersive Design

The transition from space render to reality should be seamless. We utilize immersive technology to ensure there are no surprises between design and build.

omega-construction-integration

Construction Integration

Systemized, modular construction allows us to build more flexible, cost-effective buildings ready to adapt as your business and priorities grow.

TITAN Arena Human Performance Facility

Using a SBIR Phase III to complete human performance center renovations. Case Story

351st SWTS Sim Lab

Simulation lab to aid in Air Force training of warfighter's physical and cognitive abilities. Case Story
bulldozer

What stage is your project in?